Demolition Permits

Apply for a demolition permit before removing a structure, and learn about required utility disconnections.

Permitting

A demolition permit is required before any structure, or a significant portion of one, is removed. Applicants must show that water, sewer, and gas service have been properly disconnected and capped before demolition begins, and that any asbestos survey requirements have been met.

Who this applies to
Property owners and licensed contractors planning to demolish a residential or commercial structure within city limits.
How to apply
Submit the Demolition Permit Application along with proof of utility disconnection and any required environmental documentation. Permits are typically reviewed within five business days.