Capital Projects

Bellwood Public Works maintains a rolling program of capital improvements to streets, water and sewer infrastructure, stormwater systems, and parks. Each project below lists its current phase, approved budget, and expected timeline.

8 projects

  • In Construction

    Bridge Street Resurfacing

    Full-depth resurfacing of Bridge Street between Oak Avenue and the river crossing, including new pavement markings, updated storm drain grates, and ADA-compliant curb ramps at all intersections along the corridor.

    Division
    Streets Division
    Approved budget
    $1.4 million
    Timeline
    May 2026 through September 2026
  • Design

    Oakhill Lift Station Rehabilitation

    Replacement of aging pumps, motor controls, and electrical systems at the Oakhill sewer lift station, which serves the Oakhill subdivision and surrounding neighborhoods. The project also adds a backup generator to maintain service during power outages.

    Division
    Water and Sewer Division
    Approved budget
    $2.1 million
    Timeline
    Design fall 2026, construction spring through fall 2027
  • In Construction

    Eastside Trail Extension, Phase Two

    Extends the Eastside Trail from its current terminus at Birch Street to connect with the Riverside Drive greenway, adding a half mile of paved multi-use path, a pedestrian bridge over Willow Creek, and trailhead signage.

    Division
    Parks and Recreation
    Approved budget
    $980,000
    Timeline
    June 2026 through spring 2027
  • Planning

    Willow Creek Drainage Improvements

    Addresses recurring street flooding in the Southside district through channel widening, a new detention basin near Industrial Parkway, and upsized storm drain piping along the Willow Creek corridor. Currently under review by the Stormwater Advisory Committee.

    Division
    Stormwater Division
    Approved budget
    $3.6 million
    Timeline
    Planning through 2026, construction beginning 2027
  • Completed

    Oak Avenue Sidewalk and ADA Ramp Construction

    Constructed new sidewalk along Oak Avenue between 2nd Avenue and Maple Avenue where none previously existed, and rebuilt eleven corner curb ramps to current ADA standards. Completed under budget and reopened to full pedestrian access ahead of schedule.

    Division
    Streets Division
    Approved budget
    $720,000
    Timeline
    April 2025 through February 2026
  • Completed

    4th Avenue Culvert Replacement

    Replaced an undersized, deteriorating stormwater culvert beneath 4th Avenue at the Willow Creek crossing with a larger reinforced concrete box culvert designed to handle a 100-year storm event and reduce upstream flooding.

    Division
    Stormwater Division
    Approved budget
    $540,000
    Timeline
    August 2025 through September 2025
  • Design

    Public Works Annex Solar Retrofit

    Adds a rooftop solar array and battery storage system to the Public Works Annex on Industrial Parkway, projected to offset roughly 60 percent of the facility's annual electricity use and provide backup power during outages for the vehicle fueling depot.

    Division
    Administration
    Approved budget
    $610,000
    Timeline
    Design winter 2026, installation summer 2027
  • Planning

    Citywide Water Meter Upgrade

    Replaces roughly 11,000 aging mechanical water meters citywide with automated meter infrastructure, allowing remote reading, faster leak detection, and elimination of estimated billing. Funding strategy is under review as part of the multi-year capital plan.

    Division
    Water and Sewer Division
    Approved budget
    $4.2 million
    Timeline
    Planning through 2026, phased installation 2027 through 2029