Seal of the City of Bellwood, founded 1889CITY OF BELLWOODEST. 1889City of BellwoodDepartment of Public Works

Public Notices

Current and recent public notices from Bellwood Public Works, including service disruptions and closures.

Showing 25 of 25 notices

  • City offices closed for Labor Day

    All Bellwood Public Works offices, including the permitting counter and utility billing office, will be closed on Labor Day. Waste and recycling collection will run one day later than usual that week.

    August 15, 2026

  • Emergency water main repair on Elm Street

    Crews are repairing a broken water main between 4th Avenue and 6th Avenue. Expect low water pressure in the surrounding blocks through the end of the day. Elm Street is closed to through traffic while repairs are underway.

    July 26, 2026

    Urgent notice
  • Boil water notice lifted for the Northside district

    Water quality testing following last week's main repair has confirmed the Northside district's water supply meets all safety standards. The boil water notice issued on July 20 is no longer in effect.

    July 25, 2026

  • Boil water advisory issued for the Northside district

    Following the water main repair on Elm Street, a precautionary boil water advisory is in effect for the Northside district, bounded by 4th Avenue, Birch Street, and the rail corridor. Residents should bring tap water to a rolling boil for one minute before drinking or cooking until testing confirms the system is clear.

    July 20, 2026

    Archived
  • Bid solicitation: Oakhill lift station rehabilitation

    Bellwood Public Works is soliciting sealed bids from qualified contractors for the rehabilitation of the Oakhill sewer lift station, including pump replacement and electrical upgrades. Bid documents are available from the Purchasing Office. Bids are due by 2:00 PM on August 21, 2026.

    July 17, 2026

  • Public hearing scheduled on Maple Avenue rezoning application

    The Planning Commission will hold a public hearing on a proposed rezoning of the 900 block of Maple Avenue from single-family residential to mixed-use. The hearing is part of the August 11 Planning Commission meeting. Written comments may be submitted in advance through the Planning Office.

    July 15, 2026

  • Bridge Street closed for resurfacing through August

    Bridge Street between Oak Avenue and the river crossing is closed to vehicle traffic while crews complete a full-depth resurfacing project. A signed detour routes traffic via Oak Avenue and Riverside Drive. Pedestrian access remains open.

    July 14, 2026

  • Sidewalk closure on Birch Street near the recreation center

    The sidewalk along the 400 block of Birch Street will be closed for curb ramp reconstruction to bring the corner into compliance with accessibility standards. Pedestrians should use the marked detour on the opposite side of the street. Work is expected to take approximately two weeks.

    July 10, 2026

  • Public hearing on proposed stormwater fee ordinance

    City Council will hold a public hearing on a proposed ordinance updating the stormwater utility fee schedule. The hearing is part of the July 7 regular Council meeting. Residents may submit written comments to the City Clerk's Office prior to the meeting.

    June 20, 2026

    Archived
  • Stormwater utility fee adjustment approved

    City Council approved a modest adjustment to the stormwater utility fee effective with the next billing cycle. Property owners with approved on-site stormwater controls remain eligible for a reduced rate.

    June 2, 2026

  • Seasonal outdoor watering schedule now in effect

    The annual summer outdoor watering schedule is now in effect through September 30. Addresses ending in an odd number may water lawns and gardens on odd-numbered calendar days, and even-numbered addresses on even-numbered days, between 6:00 PM and 10:00 AM.

    June 1, 2026

  • Public hearing on proposed Willow Creek drainage improvements

    The Stormwater Advisory Committee will accept public comment on proposed drainage improvements near Willow Creek, intended to reduce recurring street flooding in the Southside district. The hearing is part of the August 18 committee meeting at the Public Works Annex.

    May 28, 2026

  • Spring hydrant flushing program completed

    The annual hydrant flushing program, which can cause temporary water discoloration, wrapped up in all city districts as of this notice. Residents who still notice discolored water are encouraged to run a cold tap for a few minutes.

    April 30, 2026

    Archived
  • Bid solicitation: Eastside Trail extension, phase two

    Sealed bids are being accepted for phase two construction of the Eastside Trail extension, connecting Birch Street to the Riverside Drive greenway. Bid documents are available from the Purchasing Office. A mandatory pre-bid site walk will be held on April 22 at the trailhead on Birch Street.

    April 8, 2026

    Archived
  • Winter storm advisory: parking restrictions lifted

    Snow emergency parking restrictions issued during the January storm have been lifted. Residential streets have been fully plowed and normal parking rules are back in effect.

    January 18, 2026

    Archived
  • Snow emergency declared for the January 17 storm

    A snow emergency has been declared effective 6:00 PM. Parking is prohibited on designated snow emergency routes until the emergency is lifted. Vehicles left on emergency routes are subject to towing. Priority routes will be plowed first, followed by residential streets.

    January 17, 2026

    Archived
  • City offices closed for New Year's Day

    All Bellwood Public Works offices will be closed on New Year's Day. Waste and recycling collection scheduled for that day will be collected on the next regular business day, with all subsequent pickups that week shifting back by one day.

    December 29, 2025

    Archived
  • Bid solicitation: replacement fleet vehicles

    Bellwood Public Works is accepting sealed bids for the purchase of six replacement service vehicles for the Streets and Water and Sewer Divisions. Specifications and bid forms are available from the Purchasing Office. Bids are due by 2:00 PM on December 5, 2025.

    November 10, 2025

    Archived
  • Curbside yard waste collection extended through November

    In response to resident requests, biweekly curbside yard waste collection has been extended through the end of November this year. Bundled brush and bagged leaves should be placed at the curb by 7:00 AM on the scheduled collection day.

    October 6, 2025

    Archived
  • Fall leaf collection schedule announced

    Loose leaf collection will run on a rotating district schedule from late October through early December. Residents should rake leaves to the curb, not into the street, by 7:00 AM on their district's scheduled week. Leaves placed in plastic bags will not be collected through this program.

    October 1, 2025

    Archived
  • Water main break repaired in the Oakhill subdivision

    Crews completed emergency repairs to a water main break on Cedar Court in the Oakhill subdivision. Water service has been restored to all affected addresses. Some residents may notice temporary discoloration as the system repressurizes.

    September 12, 2025

    Archived
  • 4th Avenue closed for culvert replacement

    4th Avenue between Elm Street and the Willow Creek crossing is closed to all traffic while crews replace an aging stormwater culvert. A signed detour routes traffic via 6th Avenue. The closure is expected to last approximately three weeks.

    August 4, 2025

    Archived
  • Emergency alert: severe thunderstorm warning in effect

    A severe thunderstorm warning is in effect for Bellwood and surrounding areas until 9:00 PM. Residents should avoid unnecessary travel. Public Works crews are on standby to respond to downed trees, flooded roadways, and storm-related outages.

    July 19, 2025

    Archived
  • New recycling carts rolling out to the Southside district

    Households in the Southside district will receive new 65-gallon recycling carts this month as part of the citywide cart replacement program. Residents should place their old bin at the curb for pickup once the new cart is delivered. No action is required to receive a new cart.

    March 17, 2025

    Archived
  • Bid solicitation: Oak Avenue sidewalk and ADA ramp construction

    Sealed bids are being solicited for new sidewalk construction and ADA-compliant curb ramps along Oak Avenue between 2nd Avenue and Maple Avenue. Bid documents are available from the Purchasing Office. Bids are due by 2:00 PM on March 6, 2025.

    February 10, 2025

    Archived

Page last updated:

Was this page helpful?